COVID-19 Dashboard

There have been 55 positive COVID-19 cases on campus in the last 14 days.

Last updated: January 18, 2022, 4:25 p.m.


COVID-19 positive cases

A positive COVID-19 case in a building means that an individual either worked, attended class or otherwise spent a significant amount of time in this building.  One case might span more than one building.

The following actions are taken when there are positive cases on campus :

  1. Areas occupied by the individual during infectious period were contained, cleaned and disinfected
  2. Contact tracing was conducted by AHS with support from the University and anyone determined to be a close contact of the individual was contacted and instructed to isolate. Risk to others present or working in the zones is considered very low

As per exposure criteria established by Alberta Health, a close contact is anyone who, during the infectious period has lived with or was within two metres of a person who has COVID-19 for 15 minutes, even if a non-medical mask was worn during that contact. This includes cumulative contact where multiple interactions add up to 15 minutes or more. A close contact could also be someone who had direct physical contact (handshake, hugging, kissing) with an infectious person or direct contact with their bodily fluids, such as being coughed or sneezed on. Wearing a non-medical mask is not sufficient to exempt you from being considered a close contact.

Individuals on campus should take precautions in all spaces, and work under the assumption that an infection is possible. Please continue to take measures to prevent the spread of COVID while inside and outside of the workplace. This means taking steps to protect yourself and others by practicing good hygiene, physical distancing and monitoring for symptoms.


Covid-19 Most Recent Campus Exposure (Cases)

*An individual with COVID-19 might have been in multiple buildings while infectious. As a result, this dashboard shows the number of cases for each building on campus. Cases that occur in more than one building are counted in each affected building and only once in the totals.

Location  0-3 days ago 4-7 days ago 8-14 days ago Total by Location
Mac Hall   1 1 2
Kananaskis Hall   4 3 7
Aurora Hall     1 1
Rundle Hall     3 3
Yamnuska Hall     3 3
International House   3 6 10
Crowsnest Hall     1 1
Glacier Hall   1   1
Dining Centre   13 11 24
HRIC     3 3
HMRB 1 1 2 4
Health Sciences 1 3   4
Cascade Hall   4 3 7
Biological Sciences     1 1
Professional Faculties     1 1
Kinesiology   2   2
Fitness Centre   1 2 3
Aquatic Centre   1 5 6
TFDL   2 1 3
Engineering   1   1
Education Tower   2 2 4
Student Wellness Centre     1 1
MEB     1 1
MacKimmie Tower   1 2 3
Grounds Building     1 1
Olympic Oval     1 1
EEEL Building   1   1
Science A/B   1   1
Craigie Hall   1   1
Math Sciences   1   1
Jack Simpson Gym     2 2

 


Details of COVID-19 cases on campus

CURRENT COVID-19 CASES ON CAMPUS

January 18 notification: Multiple Buildings: Read More
January 17 notification: Multiple Buildings: Read More
January 14 notification: Multiple Buildings: Read More
January 13 notification: Grounds Building: Read more
January 12 notification: Multiple buildings: Read More
January 11 notification: Multiple Buildings: Read More
January 10 notification: Multiple Buildings. Read More
January 9 notification: Multiple Buildings. Read More
January 5 notification: Multiple Buildings. Read more
 

PAST COVID-19 CASES ON CAMPUS

Jan. 7 notification: Varsity Courts, Education Tower & Earth Science. Read more.
Jan. 8 notification.  MacKimmie Tower, Mac Hall food court. Read more. 
Jan. 25 notification: Professional Faculties Building. Read more.  
Jan. 27 notification:  Kinesiology B, Heritage Medical Research Building. Read more.
Feb. 12 notification: Health Research Innovation Centre (HRIC). Read more.
Feb. 17 notification: Health Research Innovation Centre (HRIC). Read more.
Feb. 26 notification: Engineering Block, The Landing, International House. Read more. 
Mar 1 notification: Child Development Centre. Read more.
Mar 11 notification: Aquatic Centre. Read more.
Mar 19 notification: Biosciences. Read more.
Mar. 22 notification: Kinesiology A. Read more.
Mar. 26 notification: Kinesiology complex. Read more. 
April 1 notification: Kinesiology A, Murray Fraser Hall. Read more.
April 6 notification: MacEwan Student Centre. Read more
April 7 notification: Dining Centre. Read more. 
April 9 notification: Multiple Buildings. Read more
April 13 notification: Kinesiology A and B. Read more.
April 14 notification: Multiple Buildings. Read more.
April 15 notification: Foothills Campus. Read more.
April 16 notification: Multiple Buildings. Read more.
April 20 notification: Multiple Buildings. Read more. 
April 21 notification: Arts Building. Read more.
April 23 notification: Multiple Buildings. Read more.
April 24 notification: Scurfield Hall. Read more. 
April 26 notification: EEEL. Read more. 
April 27 notification: Multiple Buildings. Read more.
April 30 notification: Dining Centre. Read more. 

May 3 notification: Kinesiology B. Read more. 
May 4 notification: Multiple Buildings. Read more. 
May 10 notification: Multiple Buildings. Read more.
May 10 notification: Health Science Centre. Read more.
May 13 notification: Engineering D Block. Read more.
May 18 notification: Mechanical Engineering Building. Read more. 
May 25 notification: Engineering G Block. Read more.
May 31 notification: University Research Centre. Read more.

June 9 notification: Downtown Campus. Read more.
June 16 notification: Engineering C Block, Maker Multiplex, EEEL 4th floor, MacEwan Hall. Read More
June 21 notification: MacEwan Hall, Teaching, Research & Wellness, Rozsa Centre, Physical Plant. Read More
June 25 notification: Spyhill Clinical Skills Building Read More

July 21, 22 & 23 notification: Physical Plant, Aquatic Center. Read More. 
July 19 notification: HRIC, Kinesiology B, Fitness Centre & Jack Simpson Gym. Read More

August 5 & 6 notification: TFDL, Engineering C, Engineering A, Physical Plant Building, Mac Hall & Mechanical Engineering Building. Read More.
August 3 & 5 notification: Art Building, Parkade 633. Read More.
August 16, 17, 18 & 19 notification: Education Classrooms, Cascade Hall, MacHall, Science A. Read more
August 23 notification: Foothills Campus. Read More
August 23 notification: MacEwan Student Center. Read More
August 25 & 26 notification: Olympic Oval. Read More
August 30 notification: Scurfield Hall. Read More

September 2 notification:  Health Research Innovation Centre (HRIC), Heritage Medical Research Building (HMRB) Read More
September 3 notification: MacEwan Student Centre Bookstore, Professional Faculties, Heritage Medical Research Building (HMRB) Read More
September 7 notification: Dining Centre. Read More
September 8 notification: Engineering Block G, Engineering Building, ICT Building. Read More
September 9 notification: International House, MacEwan Student Centre Parkade, Upass Centre, Dining Centre, Kananaskis Hall, Cascade Hall, EEEL Building, ICT Building, Science A, Engineering Student Centre. Read More
September 10 notification: Education Tower, Education Classrooms, Taylor Family Digital Library Good Earth, MacEwan Student Centre, Downtown Campus, Murray Fraser Hall, Upass Centre, Kinesiology Building, Mac Hall Bookstore. Read More
September 13 notification: Cascade Hall, Dining Centre, Kinesiology, Downtown Campus, Engineering Building, MacEwan Student Centre, Health Science Centre, Professional Faculties, ICT Building, Murray Fraser Hall, Craigie Hall, MacKimmie Tower, Heritage Medical Research Building, Science Theatres. Read More
September 14 notification: MacEwan Student Centre, MacEwan Student Centre Bookstore, Education Tower, Yamnuska Hall, Kinesiology Building, Taylor Institute Studio, ICT Building, Heritage Medical Research Building, Health Research Innovation Centre, Biological Sciences, Active Living Centre Gym, EEEL Building, The Den. Reach More.
September 15 notification: Scurfield Hall, Professional Faculties, Kinesiology, Murray Fraser Hall, Taylor Institute. Read More
September 17 notification: Science B, Science Theatres, EEEL, WA Ranch, Rundle Hall, Murray Fraser Hall, ICT, Dining Centre, Kinesiology A & B, Engineering C, Math Sciences. Read More.
September 20 notification: Social Sciences, Scurfield Hall, Fitness Centre, Swimming Pool & Locker Room, Science A, MacEwan Student Centre, Earth Sciences, Engineering A, Oval, EEEL building, Math Sciences, Biological Sciences, Craigie Hall, Aquatic Centre, TFDL, Teaching, Research & Wellness. Read More
September 21 notification: Alberta Children's Hospital, Taylor Family Digital Library, Spy Hill HDL. Read More
September 23 notification: Kananaskis, Kinesiology, ICT, Dining Centre, TFDL, Fitness Centre. Read More
September 28 notification: Science Theatres, Engineering, ICT Building, Kinesiology, Science A, Math Sciences, Science Theatres, Earth Sciences, TI Forum, Science B, Scurfield Hall, TFDL, Fitness Centre, Pool and MacEwan Student Centre. Read More
September 29 notification: Administration, Kinesiology, Social Sciences, Math Sciences, Science Theatres, MacEwan Student Centre, Health Science Centre. Read More

October 1 Notification: Social Sciences, Science B, Education Classrooms, Scurfield Hall. Read More.
October 4 notification: Biological Sciences, Teaching, Research & Wellness, Scurfield Hall, Education Classrooms, Basketball Court/Jack Sympson Gym. Read More
October 13 notification: Scurfield Hall. Read More
October 18 notification: Scurfiled Hall, Health Sciences Centre. Read More.
October 19 notification: Downtown campus, Barrier Lake Field Station. Read More
October 21 notification: Olympic Oval, Education Classrooms. Read More
October 22 notification: Science Theatres. Read More
October 26 notification: Engineering, Olympic Oval. Read More


November 3 notification: Craigie Hall, Engineering, TI Forum, Science Theatres, Dining Centre, Rundle Hall, Cascade Hall, Aurore Hall, Fitness Centre, MacHall, The Den, Read more
November 4 notification: ICT Building and MacKimmie Tower. Read More
November 12 notification: Aurora Hall, Dining Centre. Read More
November 17 notification: HMRB. Read More
November 19 notification: HSC. Read More
November 22 notification: Kinesiology, Kananaskis Hall, Dining Centre, ICT Building, EEEL Building, Science Theatres, Glacier Hall, Taylor Family Digital Library, Scurfield Hall. Read More
November 24 notification: Engineering. Read More
November 30 notification: MacEwan Student Centre, Science Theatres. Read More.

December 1 notification: Crowsnest Hall, Murray Fraser Hall, Dining Centre. Read More
December 2 notification: Science A, Murray Fraser Hall, Science Theatres. Read More
December 3 notification: Health Science Centre. Read more
December 16 notification: Murray Fraser Hall, Physical Plant. Read more
December 17 notification: Murray Fraser Hall. Read more
December 18 notification: Multiple Buildings. Read more
December 19 notification: Professional Faculties, SAPL downtown. Read more
December 20 notification: ACH, MacHall, KNA, Professional Faculties. Read more
December 21 notification: Dining Centre, CR, KNA, CBDL, MacHall, PF. Read more
December 22 notification: CR, Health Sciences, PF, CBDL. Read more
December 23 notification: Multiple Buildings. Read more
December 24 notification: Multiple Buildings. Read more
December 26 notification: Olympic Oval. Read more
December 27 notification: Multiple Buildings. Read more
December 28 notification: Cascade Hall, Dining Centre. Read more
December 29 notification: Biological Sciences. Read more
December 30 notification: TRW. Read more

January 2 notification: CCCMG. Read more
January 4 notification: Mac Hall, Olympus Hall, Cascade and the Varsity Court. Read More
January 6 notification: Multiple buildings. Read More

Cases between Sept 30-Dec 31, 2020 can be found here.

 

Please submit any COVID-19 questions or feedback to covid19comms@ucalgary.ca

If you feel unwell while on campus please follow these COVID-19 procedures